A bathroom remodel is one of the most impactful home upgrades you can make, but it’s also one of the most frequently misunderstood when it comes to timing. Homeowners often ask: How long does a bathroom remodel take? The answer can depend on scope, design choices, and so much more—but having a clear timeline helps set realistic expectations from the start.
For homeowners in Sioux Falls and surrounding communities, working with Hjellming Construction can make the entire process smoother, more predictable, and better aligned with your vision.
Average Bathroom Remodel Timeline in Sioux Falls Homes
Most bathroom remodels fall into three general categories:
- Cosmetic refresh
- Standard remodel
- Full custom renovation
While these ranges are common, local factors in Sioux Falls—such as material availability, seasonal demand, and permitting—can slightly adjust the schedule.
Step 1: Planning, Design, and Material Selection
Every successful remodel starts long before demolition. During the planning phase, homeowners meet with their contractor to finalize layout changes, fixture selections, tile designs, and lighting plans.
This stage often includes:
- Measuring the existing bathroom
- Creating design drafts or computer-generated layouts
- Selecting cabinetry, countertops, flooring, and fixtures
- Establishing a budget and timeline
Hjellming Construction has been serving the region since 1962, bringing decades of experience to this phase. Our deep understanding of remodeling and custom home construction helps homeowners avoid costly delays later in the process.
Step 2: Permits and Pre-Construction Prep
In many cases, especially for structural or plumbing changes, permits are required in Sioux Falls. This step can take anywhere from a few days to a couple of weeks depending on the scope of work.
During this time, our team will also:
- Order materials (some custom items may have longer lead times)
- Schedule subcontractors (plumbers, electricians, tile installers)
- Prepare the job site to minimize disruption
Proper planning is critical here. Experienced builders know how to sequence orders and labor so that no time is wasted once construction begins.
Step 3: Demolition and Rough-In Work
Once construction begins, the transformation becomes visible quickly. Demolition usually takes only a few days, but it marks the beginning of the real structural work.
After demolition, contractors move into the “rough-in” phase:
- Plumbing adjustments or rerouting
- Electrical upgrades and lighting placement
- Framing for new walls or layouts
- Inspections (if required)
This stage is essential for ensuring your bathroom not only looks good but functions properly for years to come.
Step 4: Installation and Build-Out
This is where your new bathroom truly starts to take shape. Installation work typically includes:
- Drywall and painting
- Tile flooring and shower surrounds
- Cabinet and vanity installation
- Countertop placement
- Fixture installation (toilets, sinks, faucets)
Attention to detail is key here. Our team ensures everything is level, sealed correctly, and installed to last.
Step 5: Finishing Touches and Final Inspection

This bathroom is from our Old Yankton Road remodeling project. View more here.
The final stage is all about polish and perfection, and includes:
- Trim and hardware installation
- Final paint touch-ups
- Mirror and accessory mounting
After this, a final walkthrough ensures everything meets quality standards and design expectations. Any minor adjustments or corrections are handled before the project is officially complete.
What Can Delay a Bathroom Remodel?
Even the best-planned remodels can experience delays. Common factors include:
- Backordered materials or fixtures
- Change orders during construction
- Hidden water damage or structural issues
- Permit approval delays
- Weather impacts on delivery schedules
Working with a well-established construction company significantly reduces these risks. The Hjellming Construction team—located just east of the I-29 Tea exit at the Tea Exit I-29—is accustomed to anticipating and solving problems before they become major delays.
Why Experience Matters in Bathroom Remodeling
Bathroom remodels are complex because they combine plumbing, electrical, carpentry, and design in a small space. A single mistake can lead to costly repairs later.
That’s why experience matters. Since 1962, Hjellming Construction has built a reputation in the Sioux Falls area for quality craftsmanship, custom home design, and reliable remodeling services. Our background in both residential remodeling and full custom home builds allows us to handle everything from simple updates to luxury bathroom transformations.
Final Thoughts: Setting Realistic Expectations
So, how long does a bathroom remodel take in Sioux Falls? In most cases, you can expect anywhere from 3 to 8 weeks depending on complexity. However, the most important factor isn’t just speed—it’s quality.
A well-planned remodel guided by experienced professionals ensures your new bathroom is beautiful, functional, and built to last. If you’re considering a renovation, partnering with Hjellming Construction can help turn your vision into a finished space you’ll enjoy for years to come.